ELTMAN - Engenharia e Sistemas | Soluções em Energia.

Termopernambuco Substation (230 kV)

E-mail Print PDF

This project was developed to PROMON in the year 2001. In this project was carried out the Substation of 230 kV of UTE TERMOPERNAMBUCO, with 2 spans Generator - Line of 230 kV from side to side and 1 span of Generator with bars arrangement of disjunctor and half type.

In this Project, ELTMAN has developed the follow activities:

Basic Project:

Main unifiliar diagram;
Unifiliars diagrams of Auxiliary Services;
Arrangement - floor plan and cuts;
Command room;
TE of Measurement, Protection, Command, Control and Supervision digital system
Telecommunication TE;
Disjunctors TE;
Sectionnal TE;
TE dos PTs e CTs;
Lightning-arrester TE;
Substation Points List, Electrical BOP and ONS.

Executive Project:

Detailed arrangement - floor plans and cuts;
Equipments installation in the yard;
Materials for installation lists;
Soil loop;
Aerial Network;
Yard illumination;
Cable stretching calcultations;
Efforts on structure calculation;
Metallic structure dimensioning;
Cable lists and interconnection diagrams;
Complete civil project;
Civil project of the Command house;
Measurement, Protection, Command, Control and Supervision digital system points list.